how do you find the mean completion time of a PERT network diagram?​

Respuesta :

okekesarah01642112
okekesarah01642112 okekesarah01642112
  • 02-01-2021

Answer:

PERT is an estimating technique that uses a weighted average of three numbers (see below) to come up with a final estimate. The resulting PERT estimate is calculated as (O + 4M + P)/6. This is called a "weighted average" since the most likely estimate is weighted four times as much as the other two values.

Answer Link

Otras preguntas

CAN SOMEONE PLZZZZZZ HELPP
what else helps your stomach if you cant eat bread need answer asap its an emergency
i need help please !!
1) According to the Punnett square, it is probable that these parents will have ______ female children. A) 0/4 B) 2/4 C) 3/4 D) 4/4
Amino acids are large molecules formed by long chains of proteins. Select one: True False
How would you describe this piece does this piece have a subject matter does it have content explain your answer
1/2(10x+20y+10z help me please
Secondary seismic waves (s waves) ______. are the slowest seismic waves travel through solids, liquids, and gases
ww2. when was d-day
area of a square when 1 side is 44cm